Problem 
The Client had 28 closed water systems which had not been monitored or maintained for several years. Systems were beginning to fail and heating and cooling was no longer efficient.  

Client 
Ministry of Defence (MoD) / Skanska

Services 
Mechanical Services >> 
Closed System Monitoring >>

Solution

Kirkee  successfully completed a complex project involving the installation of 28 sidestream filters across a large-scale site. Prior to commencing work, we conducted a thorough closed system analysis to assess the specific requirements of the project.

The filters were installed on both low-temperature closed systems and chilled pipework systems.

 

To ensure optimal performance, we conducted thorough flushes of these systems before and after the filter installation.

Following the installation, we provided our client with comprehensive instructions for ongoing system checks and maintenance. To maintain system efficiency and compliance with BISRA standards, we dosed the systems with the appropriate chemicals.

The project was particularly challenging due to the large system volumes and the stringent security requirements for accessing certain areas of the site.

 

Despite these obstacles, Kirkee  successfully delivered a high-quality solution that resulted in significantly improved system efficiency and reduced breakdowns.

WMS.png
WIAPS.png
WaterSafe.png
Safety Pass Alliance.png
safe Contractor.png
LCL.png
PASNA.png
IPAF.png
Constructionline Gold Member.png
City Guilds.png
Armed Forces Convenant.png
IOSH.png

OUR ACCREDITATIONS AND CERTIFICATES

bottom of page